In this issue:
- Striping Layout Approved
- Construction Reminders
- Project Photos
- Project Overview
- Construction Notes
Striping Layout Approved
[updated!] The preliminary pavement markings, which are a guide for where the permanent lane lines or markings will later be placed, have been approved by the City. It’s anticipated that the permanent striping work will be scheduled to begin within the next one-to-two weeks. Most of the striping will be performed by the contractor, and the City will subsequently follow up to complete that work.After completion of the roadway striping, a final walk-through inspection will take place and the punch list items (small repairs and clean up) will be identified. Punch list items will be addressed in both the Coffey Park and Fountaingrove areas.
As a reminder, the aggregate surface of the newly slurry-sealed streets will become smoother as it is driven on (unlike streets that received a new layer of asphalt). Streets with higher traffic volumes are seeing this result sooner. For those streets with less traffic, it will take additional time. Thank you for your continued patience.
Construction Reminders
There will be minimal impacts to residents and motorists during this final phase of striping and punch list work. Please continue to watch for trucks, equipment, and work crews on and around the areas of work.
For more information and background about the Neighborhood Road Recovery project please visit the website at www.neighborhoodroadrecovery.com.
Project Photos

Project Overview
The project resurfaced 33 miles of residential City streets damaged following the 2017 Tubbs Fire. Two pavement treatment options were applied to resurface the pavement on this project. One pavement treatment option involved a mill-and-fill asphalt replacement, and the other involved dig-out repairs and application of a latex-modified, high-volume traffic slurry seal treatment. The type of treatment applied to a street depended on the pavement condition of the roadway. The project also included the installation of approximately 330 ADA-compliant pedestrian curb ramps.
Construction Notes
As with all large construction projects, there are unavoidable disruptions to nearby neighbors and to motorists traveling in the area – noise, dust, lane closures, and traffic delays for example. When driving, walking, or biking in the area, always be aware of construction crews and equipment, flaggers, special signage, slower traffic, and rough roadways. Use an alternate route if possible, and allow for additional time to get to and from your destination.
For information about the Coffey Park and Fountaingrove Neighborhood Road Disaster Recovery Project and to ensure you are getting up-to-date project information, visit the Project web page at www.NeighborhoodRoadRecovery.com. Please share this information with your neighbors.
If you have questions or concerns about this project, send an email to info@NeighborhoodRoadRecovery.com or call the project information line at (707) 385-1239.
Thank you for your patience and cooperation!