In this issue:
- Fountaingrove Neighborhood Paving Operations Underway
- Impacts to Businesses on Round Barn Blvd
- Project Overview
- Construction Notes
Fountaingrove Neighborhood Paving Operations Underway
[updated!] Paving operations in the Fountaingrove area are now underway, and scheduled to continue on various streets into November. The streets scheduled to be paved during the weeks of October 7 and October 15 are listed below.Please note: residents on the listed streets are asked to ensure that any trailers, equipment, vehicles, or materials from private construction projects are removed from the street as soon as possible, to avoid impeding the progress of the paving work.
The work on these streets will consist of grinding and removing approximately 2-3 inches of the roadway, and replacing it with new asphalt. Typical working hours will be Monday – Friday, 7:00 a.m. to 5:00 p.m., although lane closures will not begin until 8:00 a.m. Some lane closures may extend beyond 5:00 p.m., depending on the weather and the speed at which the asphalt cools. Schedule is subject to change due to weather or unforeseen circumstances.
Please note that these streets are not listed in the sequence that they will be paved, as some flexibility in the schedule is required due to day-to-day changes that impact operations. For more information on when a specific street will be paved please call the project information line at (707) 385-1239.
Schedule for Wednesday, October 9 to Monday, October 14
- Round Barn Boulevard (westbound loop)
Schedule for Tuesday, October 15 to Wednesday, October 23
- Thomas Lake Harris Drive
- Skyfarm Drive
- Sant Andres Drive
- Llyn Glaslyn Place
For the entire paving schedule please visit the website at www.NeighborhoodRoadRecovery.com.
Impacts to Businesses Located on Round Barn Blvd
[updated!] Paving of Round Barn Boulevard is currently underway and expected to continue through the end of this week. While this work is underway, there will be temporary, short-term access restrictions to some driveways.What to Expect:
- Lane Closures: The contractor will only close one set of lanes – either eastbound (inner loop) or westbound (outer loop) – at a time.
- The outer loop (westbound) is expected to start Wednesday October 9, and last for approximately two days. During this period, only eastbound/inner loop travel on Round Barn will be available.
- Repaving of the inner loop (eastbound) is now complete and open to traffic.
- Please be aware of all traffic control signage and flaggers.
- Driveway Access: There may be brief periods (up to an estimated 20 minutes) when driveways into businesses along Round Barn Blvd. will be inaccessible due to paving work directly in front of those driveways. Please call the project information line at (707) 385-1239 with any questions or concerns.
- Flaggers on-site will manage traffic and make every effort to minimize delays and provide driveway access when possible.
Emergency vehicles will always be given access.
Project Overview
The project will resurface 33-miles of residential City streets damaged following the 2017 Tubbs Fire. Two pavement treatment options will be applied to resurface the pavement on this project. One pavement treatment option will involve a mill-and-fill asphalt replacement and the other involves dig-out repairs and application of a latex-modified, high-volume traffic slurry seal treatment. The type of treatment applied to a street depends on the pavement condition of the roadway. The project will also include the installation of approximately 330 ADA-compliant pedestrian curb ramps.
Construction Notes
As with all large construction projects, there will be unavoidable disruptions to nearby neighbors and to motorists traveling in the area – we apologize in advance for noise, dust, lane closures, traffic delays, and any other impacts or inconveniences. When driving, walking, or biking in the area, always be aware of construction crews and equipment, flaggers, special signage, slower traffic, and rough roadways. Use an alternate route if possible, and allow for additional time to get to and from your destination.
For information about the Coffey Park and Fountaingrove Neighborhood Road Disaster Recovery Project and to ensure you are getting up-to-date project information, visit the Project web page at www.NeighborhoodRoadRecovery.com. Please share this information with your neighbors.
If you have questions or concerns about this project, send an email to info@NeighborhoodRoadRecovery.com or call the project information line at (707) 385-1239.
Thank you for your patience and cooperation!