Construction Update July 3, 2024

posted in: Construction Updates | 0

In this issue:

  • Coffey Park Paving Locations and Impacts
  • San Miguel Rd and SMART Intersection Closure
  • Fountaingrove Road Repairs
  • Construction Photos
  • Project Overview
  • Construction Notes

Coffey Park Paving Locations and Impacts

[updated!] Paving operations resumed Monday, June 24, in the Coffey Park neighborhood. The streets scheduled to be paved over the next week are listed below.

The work on these streets will consist of grinding and removing approximately 2-3 inches of the roadway, and replacing it with new asphalt. The full length of the street will be paved unless otherwise noted. Schedule is subject to change due to weather or unforeseen circumstances.

Please note that these streets are not listed in the sequence that they will be paved, as some flexibility in the schedule is required due to day-to-day changes that impact operations. For more information on when a specific street will be paved please call the project hotline at (707) 385-1239.  

Schedule for Wednesday, July 3 to Friday, July 12

  • Amanda Pl
  • Barnes Rd
  • Camino Del Prado
  • Coffey Meadow Dr
  • Dogwood Dr
  • Jenna Pl
  • Monticello Ct
  • Pine Meadow Dr
  • San Sonita Dr
  • Santiago Dr (Kerry Ln to Pine Meadow Dr)
  • Santiago Dr (Pine Meadow To San Miguel)

For the entire Phase 3 paving schedule please visit the website at www.NeighborhoodRoadRecovery.com.

Please Note:

  • While this work is underway there will be ‘No Parking’ signs posted along the street.
  • Work hours, including ‘No Parking’ hours, are from 8:00 am to 5:00 pm., Monday through Friday.
  • All driveways will have access at the end of each workday.
  • Emergency vehicle access and/or resident evacuation in event of emergency will always be accommodated.
  • If you need to use your vehicle on your street’s paving days, please park on an adjacent street.
  • If you have special/urgent circumstances requiring getting your vehicle in or out of your driveway while the work is taking place, please make contact with one of the on-site inspectors or call (707) 385-1239 for assistance.
  • Trash/recycling collection will be accommodated via coordination with the collection service.
  • Mail and package deliveries should not be impacted by construction activities. When needed, delivery vehicles are parked away from the construction zone and mail/packages are delivered on foot.

When traveling on or near the streets being paved, please use extra caution and watch for construction crews, equipment, flaggers, and special construction/traffic signage.

San Miguel Rd and SMART Intersection Closure

[new!] During the week of July 29 San Miguel Road, at the SMART transit crossing, is tentatively scheduled to be closed. This closure is likely to last for the entire week and will not be open to vehicle traffic at that time. Additional information regarding the closure will be provided in subsequent updates.

Fountaingrove Road Repairs

The initial phase of paving restoration in Fountaingrove is complete. The contractor will be returning at a later date to apply a slurry seal to the same areas where road repairs recently occurred. This will help protect the road and ensure a uniform look. Notices will be provided to residents prior to work resuming in the Fountaingrove area.

Construction Photos

[updated!]
Compacting the freshly poured asphalt
Compacting the freshly poured asphalt

 

A newly paved court
A newly paved court

Project Overview

The project will resurface 33-miles of residential City streets damaged following the 2017 Tubbs Fire. Two pavement treatment options will be applied to resurface the pavement on this project. One pavement treatment option will involve a mill-and-fill asphalt replacement and the other involves dig-out repairs and application of a latex-modified, high-volume traffic slurry seal treatment. The type of treatment applied to a street depends on the pavement condition of the roadway. The project will also include the installation of over 100 ADA-compliant pedestrian curb ramps.

Construction Notes

As with all large construction projects, there will be unavoidable disruptions to nearby neighbors and to motorists traveling in the area – we apologize in advance for noise, dust, lane closures, traffic delays, and any other impacts or inconveniences. When driving, walking, or biking in the area, always be aware of construction crews and equipment, flaggers, special signage, slower traffic, and rough roadways. Use an alternate route if possible, and allow for additional time to get to and from your destination.


For information about the Coffey Park and Fountaingrove Neighborhood Road Disaster Recovery Project and to ensure you are getting up-to-date project information, visit the Project web page at www.NeighborhoodRoadRecovery.com. Please share this information with your neighbors.

If you have questions or concerns about this project, send an email to info@NeighborhoodRoadRecovery.com or call the project information line at (707) 385-1239.

Thank you for your patience and cooperation!